EXTRACTOR FAN FLOW RATE TESTING

Part F flow rate ventilation testing
Get A Quote
FLow Rate Testing

Extract Flow Rate Testing

Whilst sporadically enforced, Approved Document Part F of the Building Regulations requires all residential new builds to have their installed ventilation systems tested upon completion. This is to ensure that satisfactory extract rates / air flow rates are achieved in accordance with the minimum ventilation design standards.
The requirement to undertake flow rate testing extends to all ventilation system types and strategies including simple intermittent extract fans and whole house mechanical extract systems with heat recovery (MVHR).

Part F Ventilation Testing (Flow Rate Testing) should be undertaken by a BPEC qualified technician using UKAS calibrated equipment.

Why Choose EPS Group?

Reduced fees available when Flow Rate Tests are combined with our Air Tightness Testing service

Free Practical Pre-Test Advice

Experienced multi-disciplined BPEC qualified technicians

UKAS calibrated equipment

Discounts for multiple dwellings

Multi-Disciplined Team Providing a Range of Related New Build Services Under One Roof

At EPS Group we pride ourselves on forming constructive working partnerships with our clients. We provide unrivalled customer support and technical consultation focused on providing cost-effective and practical solutions to achieving compliance with Part G of the Building Regulations.

Get a Quote

To get a FREE quotation, please contact us on 0115 7270599. 

Alternatively, fill out the Enquiry Form.

Get A Quote

What Our Clients Say:

Let’s talk about your project!

Contact us to discuss your Water Consumption Calculation requirements.