Image representing SAP Calculations by EPS Group

Why choose EPS Group?

There are many reasons to appoint us to provide your SAP Calculations including:
  • Low-Cost Fixed Fees
  • Significant Discounts for Multiple Units
  • Independent Client Focused Advice
  • High Quality Customer Driven Service
  • Extensive Part L1A / Section 6 Compliance Advice and Support
  • U-Value Calculations Included
  • On Construction Energy Performance Certificates Included
  • Expedited Service Available On Request
  • Multi-Disciplined Team Providing a Range of Related New Build Services Under One Roof

At EPS Group we pride ourselves on forming constructive working partnerships with our clients. Our highly experienced and fully accredited SAP Assessors offer unrivalled customer support and technical consultation focused on providing cost-effective and practical solutions to achieving compliance with Part L1A or Section 6.

Read More About SAP Calculations for New Build Developments

SAP Calculations for New Build Developments

SAP calculations are required for all new build dwellings in order to demonstrate compliance with Part L1A of the Building Regulations  in England & Wales or Section 6 of the Scottish Building Standards.

The SAP calculation assesses the thermal efficiency of the proposed building fabric, together with the energy requirements of the heating, lighting and hot water systems of the planned property. The SAP assessment also calculates the predicted annual carbon dioxide emissions which must meet a prescribed Target Emission Rate in order to comply.

SAP calculations are compared with the requirements of Part L1A or Section 6 and summarised within a brief report for submission to Building Control  at the design stage before any construction work commences.

Upon completion of the build, the respective SAP assessment is then upgraded to an As Built SAP Calculation incorporating any changes from the initial design, the finalised heating and hot water systems and the result of any Air Pressure Test that may have been undertaken.

Finalised SAP reports are then reissued for submission to Building Control together with an On Construction Energy Performance Certificate (EPC) which is required as part of the requirements for a completion certificate and also for the subsequent sale or let of the property.

 Why not discuss your project  with a member of our team?

Call us today on 0115 727 0599.